07/10/2023

Installing MolokClassic containers
Molok deep collection containers are installed to a depth of 1,5 m according to the installation instructions delivered with the containers. Installation is done by an authorized Molok Installation team.
Product warranty is valid when the installation is done according to the instructions given by Molok Ltd.

Installing MolokDomino containers
Installation instructions
MolokClassic
MolokDomino
- MolokDomino
- Loading, unloading, and storing MolokDomino (concrete body)
- MolokDomino Global
- MolokDomino Plus
- MolokDomino Light (surface container)
- MolokFestival (surface container)